Production Products Custom hangers Logo printing Guides Company 한국어 +82-31-638-6343

JTECH · Production guide

Injection mould transfer

A mould transfer begins with checking mould condition, machine compatibility and trial moulding results.

Moving a mould alone does not establish production conditions at a new factory. Share existing product standards, mould condition and quantities needed for the next delivery to define the review. Use this checklist when enquiring about a transfer to JTECH.

Information to prepare before sending a mould

Based on JTECH’s published production scope. Product feasibility and conditions are confirmed after review.
Material to prepareDetails to shareWhy we need it
Product photos / drawingsShape, size, important appearance and dimensional requirementsEstablish a reference for comparing existing and newly produced parts
Mould informationPhotos, dimensions, storage and current operating conditionReview machine compatibility and inspection scope
Current production conditionsMaterial, colour and any known existing settingsPrepare for trial moulding and resin sourcing
QuantityInitial quantity, repeat orders and preferred delivery datePlan transfer review and production
Finishing / dispatchPrinting, assembly, packing and destinationsDefine work and delivery scope after moulding

1. Review information and mould condition

Send product photos or drawings, mould photos and known production conditions. We review compatibility with our 150–280-tonne machines. After arrival, we inspect the mould, cooling and gate conditions. Any required repairs are discussed before mass production.

2. Confirm feasibility through trial moulding

An existing mould is not assumed to run immediately under the previous factory’s settings. Trial moulding checks the mould and product condition. We also agree inspection criteria and required finishing.

3. Agree production conditions and delivery

Based on the review, we agree resin, quantity, printing, assembly and packing, then confirm a delivery schedule. For multiple destinations, share quantities and packing requirements for each. Transfer and production lead times depend on mould condition and the current schedule.

Frequently asked questions

Should I send the mould first?

Please send product and mould photos and describe the current condition first. We will explain the information and delivery arrangements needed before inspection and trial moulding.

Can I enquire about a mould that has been stored for a long time?

Yes. Share when it was last used and its storage conditions. Feasibility and any repairs can only be confirmed after inspection.

Are transfer costs and lead times fixed?

They depend on condition, inspection and repair needs, quantity, finishing and the production schedule. We review these before quoting a cost or lead time.

Related production guides

Tell us about your product requirements

Our team will explain feasibility and the information needed. We provide a first reply within 24 hours on business days.

JTECH Co., Ltd. · 247 Seoicheon-ro, Majang-myeon, Icheon-si, Gyeonggi-do, Korea